Partner PortalAuthorized B2B distributor · US fulfillment

Rack configurator

Build the rack. Get a firm price in one business day.

Pick accelerators, a server platform, memory, storage, networking, power and the enclosure from 44 live line-card parts. Priced lines add up as you go; configuration-priced parts stay “Quote” instead of pretending to have a number. Submit the bill of materials and you get a quote reference immediately, with a firm written quote in one business day.

Partner-tier pricing Live line card Firm quote in 1 business day No account needed to request
1Configure

Pick the parts. Priced lines total as you select; configuration-priced parts are marked Quote.

2Submit the BOM

Name, work email, target date and any notes. You get a quote reference on screen immediately.

3Firm quote in 1 business day

Written line pricing, freight and the validity date, then approve and we convert it to an order.

GPUs / accelerators

pick one

Data-centre and workstation accelerators. Pick one model and the count per rack.

Server platform

pick one

Rack or tower platforms. U-height is read from the part title when it states one.

Memory

optional

Server RDIMM/LRDIMM modules, 64GB and up. Quantity is module count.

Storage

optional

Enterprise NVMe/SAS drives, 1.92TB and up. Quantity is drive count.

Networking

optional

Adapters and SuperNICs for the fabric. Quantity is card count.

Power (PDU / UPS)

optional

Rack power distribution or UPS. Ratings are shown as the title states them.

Rack enclosure

optional

Enclosures. The U-capacity check only runs when the title states it.

Your build

  • Nothing selected yet - pick a part to start.
Priced subtotal $0.00

Prices are partner tier at quantity 1. Quote-only lines are priced on the quote.

  • Rack space: add a server and a rack to check U-height.
  • Power: add accelerators or servers with published watts.
Quote reference on submit · firm quote in 1 business day · not an order

Prices shown are partner tier. Volume, multi-rack and contract pricing is quoted per account - sign in to see your contract price list, or ask on this quote.

Sanity checks

What we check before we quote

Rack space

Selected server U-heights are summed against the enclosure capacity when the enclosure title states it. If it does not, we confirm rail space on the quote.

Power draw

Published accelerator and server wattage is added up and shown. Parts without a published wattage are labelled unknown - we do not estimate TDP.

Availability

Stock is distributor supply, not our own warehouse. Availability is confirmed in writing on the quote, line by line.

Price validity

The quote states its own validity date; the API contract behind this page issues quotes valid for 30 days from issue.

Pricing tiers

Partner tier now. Volume and contract priced per account.

What you see here is the partner-tier price: the same price the partner API returns for channel=partner, produced by the BSDyno pricing engine from live distributor cost. It is not a teaser rate.

  • Quantity breaks - priced per line at the quantity you actually need; send the quantity and the break is applied on the quote.
  • Volume and contract pricing - quoted per account for repeat, multi-rack and fleet orders. There is no published volume table to invent: we price it on the account.
  • Contract price list - partners signed in to the portal see their own contract price list with CSV export, next to the public list price.

We publish exactly three things: the partner-tier price you see, the public list price on catalog pages, and a written quote for volume/contract terms. No invented tiers, no tier names that do not exist.

Next step

See your own contract price

If you are already a partner, sign in for your contract price list. If you are not, request the build above and we will quote both partner-tier and volume pricing in the same reply.

FAQ

Rack quote questions

Can I get a firm price before I talk to anyone?

Yes. Submit the build and you get a quote reference immediately. A firm written quote with line pricing, freight and a validity date comes back within one business day.

Why do some parts say “Quote” instead of a price?

Those parts are configuration-priced: the cost depends on the exact chassis, option kit or lot, so we quote them rather than print a number that would not hold. They are priced on the same quote as the priced lines.

How is the price on this page calculated?

Every priced line is the BSDyno partner-tier price from the same pricing engine that writes our quotes and quotes API responses. The page shows the price at quantity 1; quantity breaks are priced on the quote.

Do you check that the power and rack space work?

We check what the data supports: the U-height of the selected servers against the selected rack, and the published wattage of the selected accelerators and servers. Parts whose title does not publish wattage are listed as unknown - we confirm PSU and circuit sizing on the quote rather than guess here.

What happens after I submit?

1) We review the configuration and availability, usually the same business day. 2) You get a firm written quote in one business day, valid for the period stated on it. 3) Approve and we convert the quote to an order - the quote reference becomes your PO reference.

Is this an order?

No. Submitting the build creates a quote request only. Nothing is purchased, charged or shipped until you approve a written quote.

Prefer to send the workload and timeline?

Email the configuration or call the procurement desk. We will price it either way, usually the same day.