Partner PortalAuthorized B2B distributor · US fulfillment

Rack build

An 8× Intel Arc Pro B70 AI rack, quoted from live distributor pricing

A configured inference rack: 8× Intel Arc Pro B70 32GB on an ASRock dual-SP5 barebone, 2× AMD EPYC 9354, 256GB DDR5, 2× 1.92TB NVMe, ConnectX-7 200G and 2× 1100W PSU. Assembled, burn-in tested, rails included, serials captured on the invoice.

We quote it from the same distributor cost basis the portal runs on — not a PDF price list. This page deliberately publishes no rack price: the quote is the price.

Configuration

What is included

Offer details →
GPU8× Intel Arc Pro B70 32GB (256GB aggregate accelerator memory)
BareboneASRock Rack 4U8G-TURIN2/RF, dual SP5
CPU2× AMD EPYC 9354
Memory256GB DDR5
Storage2× 1.92TB NVMe
NetworkNVIDIA ConnectX-7 200G
Power2× 1100W PSU, rack rails included
Build serviceAssembly, cabling, 72h burn-in, serial capture

Why buyers ask for this configuration

  • Inference density without a datacenter contract. Eight 32GB accelerators in one 4U chassis with local NVMe and 200G fabric.
  • One quote, one BOM. GPU, CPU, memory, storage, fabric and power priced together and checked for compatibility before the price is locked.
  • Serialized delivery. Serials captured on receipt and attached to the build for warranty and RMA traceability.
  • Honest availability. Distributor stock moves hourly, so availability is confirmed on the quote instead of a stock badge.

How the quote works

  1. Send the requirement — quantity, workload, timeline, or just this reference config.
  2. The desk validates power headroom, rack density, NVMe topology, fabric choice and chassis clearance.
  3. Written quote inside 48 hours (target): part numbers, quantities, live pricing, delivery window, terms.
  4. ERP-backed order, branded PO and invoice PDFs, serials on the invoice.
  5. Fulfilment from US distribution or drop-ship with tracking; assembly and burn-in scheduled.

What we do not claim

No invented numbers

Availability and lead time

No “in stock” badge is shown for the rack. Availability is confirmed on the quote because distributor allocation moves; we do not publish a lead time we cannot hold.

Benchmarks

We publish no throughput or tokens-per-second number that has not been measured on the delivered configuration.

FAQ

Rack quote questions

How much does the 8x B70 rack cost?

Pricing is live from the distributor cost basis and changes with stock and channel. Send the requirement and the desk returns a written quote; the quote is the price.

Can I change the configuration?

Yes. GPU model and count, CPU, memory, NVMe and fabric are adjustable; the desk re-quotes the changed lines.

Is burn-in included?

Rack assembly, burn-in, rails and serial capture are included in the build quote.

What is the lead time?

Confirmed on the quote. It depends on distributor allocation and the build queue; we do not publish a number we cannot hold.

Do you ship outside the US?

The portal is built around US fulfilment and US distribution. Ask the desk about a specific destination before ordering.

Can I buy on Net 30?

Net 30 is standard for credit-approved business buyers; Net 60 is case-by-case. New accounts and first orders are prepay by ACH or wire.

Send the workload and the timeline.

We will return a BOM and a written quote — or tell you the configuration does not fit.

Request a rack quote

Services & programs

Services & installation Financing & leasing Public sector Reseller assets & training Shop by brand Compare SKUs